Evidence and unknowns
Decision brief- Verified facts
- A licensed Class A general contractor shown on the official pending application when observed on August 22, 2026. Interior demolition of vacant business office space on the 11th floor with no new construction in the filed scope.
- Our interpretation
- The filed scope lists 40,599 square feet of office interior demolition. DemoSignal treats that as a strong construction-debris signal.
- Still unknown
- Hauling assignment, buying authority, actual start, debris volume, and customer fit remain unknown.
Historical project-site hauling signals
Up to three- Most recent match
- Oct 17, 2025
- Matched sites
- 100 S Wacker Drive and 500 W Monroe Street
- Why it appears
- City records place JC Anderson building permits and Independent Recycling Services dumpster permits at both addresses within the corresponding project periods.
View 4 supporting public records
- Most recent match
- Aug 10, 2015
- Matched sites
- 303 W Madison Street and 500 W Monroe Street
- Why it appears
- The JC Anderson and Recycling Systems permits share an issue date at 303 W Madison and are five days apart at 500 W Monroe.
View 4 supporting public records
- Most recent match
- Nov 5, 2021
- Matched sites
- 333 S State Street
- Why it appears
- A Lakeshore Recycling Systems dumpster permit at 333 S State was received 10 days after the JC Anderson interior-demolition permit was issued.
View 2 supporting public records
Reviewed through Aug 23, 2026 · City of Chicago building permits naming JC Anderson were compared with construction-dumpster permits at the same addresses and close in time. No direct vendor relationship was verified.
These are same-address, close-in-time public permit matches. They do not prove a direct vendor relationship, establish a preferred vendor, or identify the hauler for the current project.
Project
40,599 sq ft office interior demolition
Interior demolition of vacant business office space on the 11th floor with no new construction in the filed scope.
Timeline
Aug 11Application opened
City began reviewing the renovation and alteration application.
Aug 22Contractor observed
General contractor and project parties were visible in the official applicant view on the observation date.
Aug 22DemoSignal snapshot
Status and applicant views were preserved with retrieval timestamps and content hashes.
UnknownDisposal assignment
Customer confirmation is required before claiming an open buying window.